An Estimation of the Impact of Uninterpretable Power Supply Systems on Electricity Distribution Utility of Pakistan – Pages 92-97

An Estimation of the Impact of Uninterpretable Power Supply Systems on Electricity Distribution Utility of Pakistan

Pages 92-97

Usama Qazi1, Muhammad Rizwan Ali1 and Abdul Moqueet2

1Industrial Engineering Department, University of Engineering and Technology, Taxila, Pakistan; 2Electrical Engineering Department, Capital University of Science and Technology, Islamabad, Pakistan

https://doi.org/10.6000/1927-5129.2018.14.13

Abstract: The power crisis in Pakistan is getting worse day by day. Electricity shortfall has reached upto 5000 MW. Due to power shortage consumers are facing load shedding for more than 6 hrs a day. To get rid of this crisis consumers have opted fossil fueled generators and UPS. Due to excessive availability UPS are more popular than generators. Although, UPS satisfy the need of consumers during power outage hour but due to efficiency constrains these UPS put extra burden on grid. This study estimates the power loss that occurs in consequence of using inefficient UPS. It has been found that about 3.75% of total power provided by the utility is lost during charging and discharging. The research also provides suggestions to eradicate the efficiency losses which occurred as a result of using UPS.

Keywords: Efficiency, Pakistan, Power Crisis, UPS.